Basement and foundation walls will be poured today.
Friday, July 9, 2010
Pouring footing, stub wall near line "E", slab in crawl space, and foundation wall on lake side. Drainage trench has been dug passing on the lake side and into the trees which will carry French drain water (there was no drain on the lake side and the one at the back was inadequate).